KUALA LUMPUR, June 24 (Bernama) -- General Electric (GE) International will design, supply and install a pure water system featuring the reverse osmosis process, to SunPower-AUO joint venture solar cell fabrication plant in Melaka.
The plant known as Fab 3 would be the largest silicon solar manufacturing factory in the world when its begin operations end of this year, said Jeff Connelly, Vice President, Engineered Systems-Water and Process Technologies for GE Power and Water.
"The GE system will help SunPower save more than 230 million gallons of water, relative to other technologies, sufficient to meet the daily water needs of more than 8,300 residents," he said in a statement Thursday.
GE served the energy sector by developing and deploying technology that helps make efficient use of natural resources.
-- BERNAMA
|